- Title
- Warragamba Dam
- In
- Journal of the Institution of Engineers, Australia
- Imprint
- vol. 36, no. 10-11, Oct-Nov 1964, pp. 239-262
- ISBN/ISSN
- 0020-3319
- Description
This paper, No.1739, was presented before the Engineering Conference, 1964 in Canberra from 13th to 17th April, 1964. It was also presented before a meeting of The Institution of Civil Engineers in London on 2lst.April, 1964. A record of the discussion at both meetings will subsequently be published in The Journal.
The author T. B. Nicol CBE BE MIEAust was Engineer-in-Chief, 1949-1961, Metropolitan Water Sewerage and Drainage Board, Sydney.
See also discussions and communications:
JIEA vol.37, no.3, Mar 1965, pp.71-82; and
JIEA vol.38, no.3, Mar 1966, pp.49-52.[This paper was awarded the Warren Memorial Prize 1964.]
- Abstract
Warragamba Dam is a straight concrete gravity wall built on sandstone foundations across the Warragamba River about 40 miles west of Sydney, Australia. Principal dimensions and data are:
Maximum height of concrete: 450ft.;
Volume of concrete: 1,610,000 cu. Yd.;
Length of crest: 1,150 ft.;
Max. depth of stored water: 340ft.;
Capacity of storage basin: 452,500 million gallons (1,665,000 ac. ft.);
Area of lake: 29 sq. miles;
Length of lake: 32½ miles;
Area of catchment: 3,383 sq. miles;
Spillway Capacity: 450,000 cusecs;
Population served (in conjunction with other dams) (1962): 2.45 million;
Area served (in conjunction with other dams): 680 sq. miles.Special features described in the paper are:
(a) The intensive geological and engineering investigation to determine the most suitable dam site;
(b) The sandstone foundation in which the rock had a Young's modulus of only about 500,000 lb./sq. in.;
(c) The provision for floods which had exceeded 400,000 cusecs.;
(d) The need to maintain supply to Sydney during the whole period of construction;
(e) The provision of a 50-M.W. hydro-electric unit for use when surplus water was available.The investigations, design and construction were carried out by the staff of the Sydney Metropolitan Water Sewerage & Drainage Board. Contractors were engaged to supply machinery, materials, etc., whilst consultants were commissioned to advise on the geology, structural designs, grouting, concrete, survey and models.
Related entries
People
See also
Related Published resources
isRelated
- Nicol, T. B.; Simon, L. L.; Alexander, G. N.;, 'Warragamba Dam (Discussions and communications)', Journal of the Institution of Engineers, Australia, 38 (3) (1966), 49-52. Details
- Nicol, T. B.; Speedie, M. G.; Michels, V.; Waitt, F. W. F.; Sweet, H. G.; Taylor, F. G.; Fulton, A. A.; Thomas, H. H.; Hunter, J. K.; Walters, R. C. S.; Leonard, M. W.; Sparkes, S. R.; Blackmore, W. E.; Loewy, E. W.; Biswas, Asit K.;, 'Warragamba Dam (Discussions and communications)', Journal of the Institution of Engineers, Australia, 37 (3) (1965), 71-82. Details