- Title
- The 330-kV Transmission System in New South Wales
- In
- Journal of the Institution of Engineers, Australia
- Imprint
- vol. 27, no. 10-11, 1955, pp. 273-285
- Description
This paper, No.1216, is to be presented before the Engineering Conference, 1956, to be held in Canberra from 16th to 21st April, 1956.
Dr. W. Diesendorf, DrEng(Vienna) AMIEAust, is System Design Engineer, Electrical and Mechanical Division, Snowy Mountains Hydro-Electric Authority.
Mr. J. J. Hurley, MSc, was formerly Executive Engineer, System Design Branch, Snowy Mountains Hydro-Electric Authority, and is now Sub-station Engineer (330-kV Projects), Transmission Division, Electricity Commission of New South Wales.
Mr. J. Wilson, BE MIEAust, is Engineer for Electrical Development, Transmission Division, Electricity Commission of New South Wales.[This paper was awarded the Electrical Engineering Prize 1955]
- Abstract
This paper discusses the transmission system in two parts: the basic design, (by Diesendorf and Hurley) and the development of the State interconnected network (by J Wilson).